Year | Project Name | Project Description | Client or Owner |
---|---|---|---|
2011 |
MTO 2011-5107 - Hwy 6 Various Structures |
Structure Repairs |
Ministry of Transportations Ontario (MTO) |
2011 |
MTO 2011-2250 Innistil Creek CSPA Culvert Rehab |
Shotcrete Culvert Liner |
MTO |
2010 |
Harbour Improvements, Midland, ON |
Harbour Repairs |
Fisheries and Oceans Canada |
2010 |
MTO 2010-5259 Old Gull River Bridge, Minden Township, ON |
Removal of the Old Gull River Bridge |
MTO |
2010 |
MTO 2010-5662 Wings Road, Bruce Mines, ON |
Structure Replacement |
MTO |
2010 |
MTO 2010-5128 Robert Creek Culvert, Verner, ON |
Culvert Liners |
MTO |
2010 |
Caswell Drive Parking Structure, Sudbury, ON |
Shoring of parking structure and asphalt removal |
Private |
2010 |
MTO 2010-5618 |
Culvert Extension |
Pedersen Construction Inc. |
2010 |
MTO 2010-5113 Meadow Creek Bridge, Iroquis Falls, ON |
Bridge Replacement |
MTO |
2010 |
MTO 2010-5116 Beaudry Creek Culvert, South River Bridge. McQuaby Creek Culver, South River, ON |
Bridge Rehab, Culvert Liners |
MTO |
2010 |
MTO 2010-5105 Granite Lake Bridge, Various Culverts, Temagami, ON |
Bridge Rehabilitation, Concrete Culvert Extensions |
Miller Paving Northern |
2010 |
MTO 2009-5109, Duck Lake Bridge Rehab, Orrville, ON |
Bridge Rehabilitation |
Fowler Construction |
2009 |
White Rose Gas Station |
Soil Remediation |
MTO |
2009 |
MTO 2009-5132 Beatty Creek Bridge Replacement, Powassan, ON |
Bridge Replacement |
MTO |
2009 |
Bark Lake Dam Rehab - MTNC0016, Barry's Bay, ON |
Dam rehab, gain replacement, valve replacement |
Ontario Power Generation (OPG) |
2009 |
Naneff Gardens - Concrete Roadway, Sudbury, ON |
Finishing of concrete roadway for subdivision |
Private |
2009 |
ESSAR Steel Algoma - Ship Dock, Sault Ste. Marie, ON |
Sheet pile dock repair and reinstallation |
ESSAR Steel Algoma |
2009 |
Wasdell Falls Generation Station |
Removal of generating unit, install environmental control, general site remediation. |
OPG |
2009 |
Cascade Bridge, Town of Parry Sound - 5183-09 |
Rehabilitation of bridge |
Town of Parry Sound |
2008 |
MTO 2006-5158, Old Hwy 537 Repairs |
Bridge girder repair |
Carillion Construction |
2008 |
MTO Nipissing Penstock Repairs, Nipissing, G.S. |
Rehabilitation of existing wood stave penstock; installation of steel reinforcing plates |
OPG |
2008 |
MTO 2008-5108 Samuel Creek Culvert Replacement, Hearst, ON |
Culvert Installation |
Pioneer Construction |
2008 |
MTO 2008-6002, Geraldton, ON |
Culvert Installation |
MTO |
2008 |
Scott Falls Spillway Repairs - Phase 3 |
Dam Rehab |
Brookfield Power Corporation |
2008 |
Airport Road Bridge Rehabilitation, Con 2 & 3, Lot 10, Earlton, ON |
Bridge Improvements |
Municipally of Earlton |
2008 |
OPG, McVittie Generating Station, Estaire, ON |
Concrete Repairs |
OPG |
2007 |
Healey Falls Swing Bridge Rehabilition |
Structural steel and swing mechanism improvements |
OPG |
2007 |
Frobisher Depot Weigh Scale |
Install new 80' weighscale at recycling centre |
City of Greater Sudbury |
2007 |
Junction Creek & Nolin Creek Inpections |
Confined space entry |
Earth Tech Consulting |
2007 |
Hollingsworth Generationg Station - Powerhouse Ice Prevention Wall |
Construction of new concrete Toe-Wall, grading and drainage work |
Brookfield Power Corporation |
2007 |
Kai-Bus-Kong River Bridge |
Bridge Replacement |
Township of Canton-Bonfield |
2007 |
Spanish Rivier Bridge |
Bridge Replacement |
City of Greater Sudbury |
2007 |
2007-005, Scott Falls Spillway Repairs, Phase 2 |
Concrete repairs |
Brookfield Power Corporation |
2007 |
2007-004, Hollingsworth Intake Concrete Repairs |
Concrete repairs |
Brookfield Power Corporation |
2007 |
PW-2007-01, Savinac Road Bridge |
New bridge construction |
Municipally of West Nipissing |
2006 |
MTO 2006-6011, Grading drainage, granular bas, paving, hazard rock removal, Hwy 6 |
Misc. |
Pioneer Construction |
2006 |
OPG South Falls Generation Station |
Penstock repairs |
OPG |
2006 |
MTO 2006-5156, Grading, drainage, granular bases, hot mix paving and structures |
NBL and SBL Hwy 69 Portage Lake structures (700' each); Pine Ridge Drive underpass, Avro Arrow Road underpass |
Pioneer Construction |
2006 |
OPG Coniston Generating Station |
Install beam in powerhouse |
OPG |
2006 |
OPG Tretheway Falls Generating Station |
Concrete repairs |
OPG |
2006 |
MTO 2006-6009, 4 structure rehab's and 10 minor structure repairs |
Various structure |
MTO |
2006 |
Meshaw Falls Bridge deck repairs |
Bridge rehab |
Municipality of French River |
2006 |
MTO 2006-5153, Grading, drainage, granular base, hot mix paving, Hwy 69 south of Hwy 17 |
Timber box culverts |
Pioneer Construction |
2006 |
MTO 2006-5150, Grading, drainage, granular base, hot mix paving, alumination and structures, Hwy 69 south of Hwy 17 |
Hwy 537 underpass; Hwy 69SBL overpass, Hwy 69NBL overpass, concrete box culvert |
Pioneer Construction |
2006 |
2006-37, Various sites, small water system upgrades |
Drinking water system upgrades |
City of Greater Sudbury |
2006 |
CN Tresties Bridge removals |
Demolition and site restoration at 3 bridge structures |
Corporation of the City of North Bay |
2005 |
TMW 2005-10, Noland Road Bridge reconstruction |
Bridge/culvert replacement |
Township of Markstay-Warren |
2005 |
OSS072621, Bridge repair crew, Cochrane Ontario area |
Various bridge repairs |
Ontario Shared Services Bureau |
2005 |
105102C, Community water system interm upgrades |
Whitefish River First Nations |
Whitefish River First Nations |
2005 |
OPG Various sites repairs |
Hagues Reach, Meyersburg, and Healy Falls, Generating Stations |
Pioneer Construction |
2005 |
Beaudry Creek Emergency Repairs |
Hwy 17 |
Pioneer Construction |